
Eskom has announced that stage 2 loadshedding will regrettably be implemented once again today, 6 December 2019 from 9 am until 6 am tomorrow morning, 7 December 2019.
“As the generating plant continues to perform at low levels of reliability, our technical teams were unable to return units from planned or unplanned maintenance as scheduled. With units not returning, we were unable to replenish water reserves overnight for our pumped storage schemes,” the statement read.

Eskom wishes to remind customers that loadshedding is a controlled measure to protect the power system from total collapse or blackout.
Check your loadshedding schedule here:
https://loadshedding.eskom.co.za/
Or download these apps

At Caxton, we employ humans to generate daily fresh news, not AI intervention. Happy reading!



